A stochastic optimization model to reduce expected post-disaster response time through pre-disaster investment decisions (Q264305): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Finding the most vital arcs in a network / rank
 
Normal rank
Property / cites work
 
Property / cites work: Network-based accessibility measures for vulnerability analysis of degradable transportation networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving stochastic transportation network protection problems using the progressive hedging-based method / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and bound algorithm for bi-level discrete network design problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4845372 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Clearance time estimation for incorporating evacuation risk in routing strategies for evacuation operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: The polynomial hierarchy and a simple model for competitive analysis / rank
 
Normal rank
Property / cites work
 
Property / cites work: Design of Survivable Networks: A survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling \(s-t\) path availability to support disaster vulnerability assessment of network infrastructure / rank
 
Normal rank
Property / cites work
 
Property / cites work: A two-stage stochastic programming model for transportation network protection / rank
 
Normal rank
Property / cites work
 
Property / cites work: The k most vital arcs in the shortest path problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Strategic network restoration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Pre-disaster investment decisions for strengthening a highway network / rank
 
Normal rank
Property / cites work
 
Property / cites work: Network capacity reliability analysis considering traffic regulation after a major disaster / rank
 
Normal rank
Property / cites work
 
Property / cites work: Evacuation transportation planning under uncertainty: A robust optimization approach / rank
 
Normal rank

Latest revision as of 17:24, 11 July 2024

scientific article
Language Label Description Also known as
English
A stochastic optimization model to reduce expected post-disaster response time through pre-disaster investment decisions
scientific article

    Statements

    A stochastic optimization model to reduce expected post-disaster response time through pre-disaster investment decisions (English)
    0 references
    0 references
    0 references
    31 March 2016
    0 references
    pre-disaster investment decisions
    0 references
    network survivability
    0 references
    post-disaster response times
    0 references
    bi-level stochastic optimization
    0 references

    Identifiers