A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application (Q2571194): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.cor.2004.09.002 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.COR.2004.09.002 / rank
 
Normal rank

Latest revision as of 07:19, 19 December 2024

scientific article
Language Label Description Also known as
English
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
scientific article

    Statements

    A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application (English)
    0 references
    0 references
    0 references
    1 November 2005
    0 references
    assembly flowshop
    0 references
    distributed database system
    0 references
    scheduling
    0 references
    maximum lateness
    0 references
    particle swarm optimization
    0 references
    tabu search
    0 references
    heuristic
    0 references

    Identifiers