A scheduling problem with unrelated parallel machines and sequence dependent setups (Q973463): Difference between revisions
From MaRDI portal
Created a new Item |
Added link to MaRDI item. |
||
links / mardi / name | links / mardi / name | ||
Revision as of 19:30, 30 January 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A scheduling problem with unrelated parallel machines and sequence dependent setups |
scientific article |
Statements
A scheduling problem with unrelated parallel machines and sequence dependent setups (English)
0 references
1 June 2010
0 references
Summary: This paper addresses a scheduling problem with unrelated parallel machines, sequence dependent setups and due dates. The problem is based on a real case and the objective is to minimise the sum of the makespan and the weighted delays. A mixed integer linear programming model is proposed and since the model considers realistic constraints, a metaheuristic based on GRASP is used as a solution method. Several versions of the metaheuristic are tested and multiple instances of the problem with different configurations are generated to test the solution quality and the computational performance.
0 references
scheduling
0 references
\texttt{GRASP}
0 references
metaheuristics
0 references