A scheduling problem with unrelated parallel machines and sequence dependent setups
From MaRDI portal
Publication:973463
DOI10.1504/IJOR.2007.014169zbMath1187.90142OpenAlexW2104677896MaRDI QIDQ973463
Martín Gómez Ravetti, Geraldo Robson Mateus, Pedro Leite Rocha, Panos M. Pardalos
Publication date: 1 June 2010
Published in: International Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijor.2007.014169
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Case-oriented studies in operations research (90B90)
Related Items
A robust optimization approach for the unrelated parallel machine scheduling problem, Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time, Unrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing time, Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints, Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration
Uses Software