A hyper-heuristic for distributed parallel machine scheduling with machine-dependent processing and sequence-dependent setup times
From MaRDI portal
Publication:6186571
Recommendations
- The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine
- Heuristic scheduling of parallel machines with sequence-dependent set-up times
- ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times
- Multi-objective multi-factory scheduling
- A scheduling problem with unrelated parallel machines and sequence dependent setups
Cites work
- Decomposition based hybrid VNS-TS algorithm for distributed parallel factories scheduling with virtual corporation
- Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
- Multi-objective multi-factory scheduling
- Soft-computing approaches for rescheduling problems in a manufacturing industry
- The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine
This page was built for publication: A hyper-heuristic for distributed parallel machine scheduling with machine-dependent processing and sequence-dependent setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6186571)