Integrating preventive maintenance planning and production scheduling under reentrant job shop (Q1993028): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import240304020342 (talk | contribs)
Set profile property.
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank

Revision as of 05:29, 5 March 2024

scientific article
Language Label Description Also known as
English
Integrating preventive maintenance planning and production scheduling under reentrant job shop
scientific article

    Statements

    Integrating preventive maintenance planning and production scheduling under reentrant job shop (English)
    0 references
    0 references
    0 references
    5 November 2018
    0 references
    Summary: This paper focuses on a preventive maintenance plan and production scheduling problem under reentrant Job Shop in semiconductor production. Previous researches discussed production scheduling and preventive maintenance plan independently, especially on reentrant Job Shop. Due to reentrancy, reentrant Job Shop scheduling is more complex than the standard Job Shop which belongs to NP-hard problems. Reentrancy is a typical characteristic of semiconductor production. What is more, the equipment of semiconductor production is very expensive. Equipment failure will affect the normal production plan. It is necessary to maintain it regularly. So, we establish an integrated and optimal mathematical model. In this paper, we use the hybrid particle swarm optimization algorithm to solve the problem for it is highly nonlinear and discrete. The proposed model is evaluated through some simple simulation experiments and the results show that the model works better than the independent decision-making model in terms of minimizing maximum completion time.
    0 references

    Identifiers