Temporary workforce planning with firm contracts: a model and a simulated annealing heuristic (Q541451): Difference between revisions

From MaRDI portal
Created claim: Wikidata QID (P12): Q58692805, #quickstatements; #temporary_batch_1714685954669
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Determining optimal pool size of a temporaray call-in work force / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimizing the use of contingent labor when demand is uncertain / rank
 
Normal rank
Property / cites work
 
Property / cites work: Workforce Planning in Mixed Model Assembly Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A successive convex approximation method for multistage workforce capacity planning problem with turnover / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulated annealing approach to the cyclic staff-scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Simulated Annealing Approach to the Solution of Flexible Labour Scheduling Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulated-annealing heuristic for shift scheduling using non-continuously available employees / rank
 
Normal rank
Property / cites work
 
Property / cites work: Manpower allocation with time windows and job-teaming constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulated annealing approach to the solution of job rotation scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4427313 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulated annealing algorithm for single machine scheduling problems with family setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulated annealing and tabu search for multi-mode project payment scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulated annealing approach for the multi-periodic rail-car fleet sizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization by Simulated Annealing / rank
 
Normal rank

Latest revision as of 03:58, 4 July 2024

scientific article
Language Label Description Also known as
English
Temporary workforce planning with firm contracts: a model and a simulated annealing heuristic
scientific article

    Statements

    Temporary workforce planning with firm contracts: a model and a simulated annealing heuristic (English)
    0 references
    0 references
    7 June 2011
    0 references
    Summary: The aim of this paper is to introduce a model for temporary staffing when temporary employment is managed by firm contracts and to propose a simulated annealing-based method to solve the model. Temporary employment is a policy frequently used to adjust the working hour capacity to fluctuating demand. Temporary workforce planning models have been unnecessarily simplified to account for only periodic hiring and laying off; a company can review its workforce requirement every period and make hire-fire decisions accordingly, usually with a layoff cost. We present a more realistic temporary workforce planning model that assumes a firm contract between the worker and the company, which can extend to several periods. The model assumes the traditional constraints, such as inventory balance constraints, worker availability, and labor hour mix. The costs are the inventory holding cost, training cost of the temporary workers, and the backorder cost. The mixed integer model developed for this case has been found to be difficult to solve even for small problem sizes; therefore, a simulated annealing algorithm is proposed to solve the mixed integer model. The performance of the SA algorithm is compared with the CPLEX solution.
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references