Multilevel production systems with dependent demand with uncertainty of lead times (Q1793230): Difference between revisions

From MaRDI portal
Created claim: Wikidata QID (P12): Q59131444, #quickstatements; #temporary_batch_1711439739529
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Parameters affecting the effectiveness of MRP systems: A review / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Effect of Leadtime Uncertainty in a Simple Stochastic Inventory Model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply management in assembly systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal decision for fashion supply chains with service level constraint and controllable lead time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A partial backlogging inventory model for deteriorating items with fluctuating selling price and purchasing cost / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal supply planning in MRP environments for assembly systems with random component procurement times / rank
 
Normal rank

Latest revision as of 20:34, 16 July 2024

scientific article
Language Label Description Also known as
English
Multilevel production systems with dependent demand with uncertainty of lead times
scientific article

    Statements

    Multilevel production systems with dependent demand with uncertainty of lead times (English)
    0 references
    0 references
    0 references
    0 references
    12 October 2018
    0 references
    Summary: This study considers a multilevel assembly system with several components in each sublevel. It is assumed that actual lead time for all components is probabilistic; and periodic order quantity (POQ) policy for ordering is utilized. If at a certain level a job is not received at the expected time, a delay is incurred at the delivery of production at this level and this may result in backorders of the finished product. It is assumed in this case that a fixed percentage of the shortage is backlogged and other sales are lost. In the real situation, some but not all customers will wait for backlogged components during a period of shortage, such as for fashionable commodities or high-tech products with the short product life cycle. The objective of this study is to find the planned lead time and periodicity for the total components in order to minimize the expected fixed ordering, holding, and partial backlogging costs for the finished product. In this study, it is assumed that a percentage of components at each level are scrap. A general mathematical model is suggested and the method developed can be used for optimization planned lead time and periodicity for such an MRP system under lead time uncertainties.
    0 references

    Identifiers