Pages that link to "Item:Q992569"
From MaRDI portal
The following pages link to A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569):
Displaying 50 items.
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling (Q1744895) (← links)
- Resource tardiness weighted cost minimization in project scheduling (Q1748510) (← links)
- Optimizing version release dates of research and development long-term processes (Q1751861) (← links)
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254) (← links)
- A column generation approach for the integrated shift and task scheduling problem of logistics assistants in hospitals (Q1753439) (← links)
- A buffer control method for top-down project control (Q1754043) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- A bi-level programming approach for global investment strategies with financial intermediation (Q1755269) (← links)
- Minimizing total weighted late work in the resource-constrained project scheduling problem (Q1792320) (← links)
- Simple matching vs linear assignment in scheduling models with positional effects: a critical review (Q1926950) (← links)
- Packing chained items in aligned bins with applications to container transshipment and project scheduling (Q1935930) (← links)
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP (Q1954712) (← links)
- A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (Q1955186) (← links)
- Resource-constrained project scheduling with activity splitting and setup times (Q2003582) (← links)
- An adaptive large neighbourhood search heuristic for routing and scheduling feeder vessels in multi-terminal ports (Q2023947) (← links)
- \( \mathrm{A}^*\) -based construction of decision diagrams for a prize-collecting scheduling problem (Q2026989) (← links)
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing (Q2027048) (← links)
- Using schedule risk analysis with resource constraints for project control (Q2028756) (← links)
- Portfolio decision analysis: recent developments and future prospects (Q2030321) (← links)
- A new algorithm for resource-constrained project scheduling with breadth and depth of skills (Q2030541) (← links)
- Diversity based selection for many-objective evolutionary optimisation problems with constraints (Q2055559) (← links)
- Solving a multi-resource partial-ordering flexible variant of the job-shop scheduling problem with hybrid ASP (Q2055805) (← links)
- Solving the integrated multi-period scheduling routing problem for cleaning debris in the aftermath of disasters (Q2106726) (← links)
- Improved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lag (Q2108105) (← links)
- Short- and medium-term optimization of underground mine planning using constraint programming (Q2112619) (← links)
- A computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects (Q2117197) (← links)
- The sample analysis machine scheduling problem: definition and comparison of exact solving approaches (Q2146991) (← links)
- A polyhedral study of event-based models for the resource-constrained project scheduling problem (Q2173056) (← links)
- Integration of routing into a resource-constrained project scheduling problem (Q2175371) (← links)
- Optimizing temporary work and overtime in the time cost quality trade-off problem (Q2178101) (← links)
- Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space (Q2197157) (← links)
- Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms (Q2218447) (← links)
- The bilevel optimisation of a multi-agent project scheduling and staffing problem (Q2239938) (← links)
- Maximizing the expected net present value in a project with uncertain cash flows (Q2239980) (← links)
- \(\mathrm{A}^\ast\) search for prize-collecting job sequencing with one common and multiple secondary resources (Q2241156) (← links)
- A local search framework for industrial test laboratory scheduling (Q2241157) (← links)
- Revenue sharing for resource reallocation among project activity contractors (Q2241246) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)
- Job sequencing with one common and multiple secondary resources: an A*/beam search based anytime algorithm (Q2289017) (← links)
- Dynamic multiobjective software project scheduling optimization method based on firework algorithm (Q2298859) (← links)
- Immediate schedule adjustment and semidefinite relaxation (Q2313755) (← links)
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems (Q2327625) (← links)
- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation (Q2336415) (← links)
- Scheduling with an orthogonal resource constraint (Q2350899) (← links)
- A metaheuristic solution approach for the time-constrained project scheduling problem (Q2362168) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)
- Genetic algorithm for the resource-constrained project scheduling problem (Q2401044) (← links)
- Integrated truck and workforce scheduling to accelerate the unloading of trucks (Q2424789) (← links)