A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems (Q1096529)

From MaRDI portal
Revision as of 12:54, 18 June 2024 by ReferenceBot (talk | contribs) (‎Changed an Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
scientific article

    Statements

    A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems (English)
    0 references
    0 references
    0 references
    1988
    0 references
    The problem of planning, scheduling, and controlling manufacturing operations over time where constraints on available resources exist (e.g. workstations, labor, facilities, materials and equipment) is a difficult mathematical programming problem. The Resource Constrained Scheduling Problem (RCSP) as it is often referred to, is known to be NP-complete which necessitates the creation of heuristics. In this paper, a multi- level, multi-priority schema is presented which enables the user to deal with static environments but places special emphasis on quasi-dynamic scheduling environments. The polynomial time and space complexity of the heuristic together with the computational experience demonstrate the effectiveness of the quasi-dynamic heuristic.
    0 references
    multiple criteria programming
    0 references
    planning
    0 references
    scheduling
    0 references
    controlling
    0 references
    manufacturing operations
    0 references
    Resource Constrained Scheduling Problem
    0 references
    multi- level, multi-priority schema
    0 references
    polynomial time and space complexity
    0 references
    heuristic
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references