The supplying chain scheduling with the cost constraint and subcontracting (Q471714)

From MaRDI portal
Revision as of 00:56, 3 April 2024 by Daniel (talk | contribs) (‎Created claim: Wikidata QID (P12): Q59047877, #quickstatements; #temporary_batch_1712101902020)
scientific article
Language Label Description Also known as
English
The supplying chain scheduling with the cost constraint and subcontracting
scientific article

    Statements

    The supplying chain scheduling with the cost constraint and subcontracting (English)
    0 references
    0 references
    0 references
    17 November 2014
    0 references
    Summary: We propose an analytical scheduling model with subcontracting. Each job can be processed either on a single machine at a manufacturer or outsourced to a subcontractor, possibly at a higher cost. For a given set of jobs, the decisions the manufacturer needs to make include the selection of a subset of jobs to be outsourced and the schedule of all the jobs. The objective functions are to minimize the commonly used scheduling measures, subject to a constraint on the total production and subcontracting cost. We show the NP-hardiness for the problems with different objective functions and develop dynamic programming algorithms for solving them.
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references