Optimisation on empty trains distribution with time window in heavy haul railway (Q2224289)

From MaRDI portal
Revision as of 08:01, 29 February 2024 by RedirectionBot (talk | contribs) (‎Changed an Item)
scientific article
Language Label Description Also known as
English
Optimisation on empty trains distribution with time window in heavy haul railway
scientific article

    Statements

    Optimisation on empty trains distribution with time window in heavy haul railway (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    3 February 2021
    0 references
    Summary: The half close form of heavy haul railway such as Daqin railway is divided into two parts, i.e., the loading region and the unloading region, according to its characteristic. We research the whole process of empty trains distribution. To guarantee loading continuity and stability, a model is proposed to minimise the empty trains multiplying hours of arriving at loading point early or late and subject to the constraints of the required empty trains in loading point, transport capacity in unloading region, the time window of loading point and the type, mode and quantity of empty trains combined in combination station and decomposed in decomposition station. The aim is to improve the efficiency of empty trains returning and reduce the operating costs. The data from Daqin heavy haul railway are performed to testify the model's correctness and effectiveness.
    0 references
    heavy haul railway
    0 references
    empty wagons distribution
    0 references
    empty wagons combination
    0 references
    empty wagons decomposition
    0 references
    Daqin railway
    0 references

    Identifiers