A two-stage hybrid flow shop with dedicated machines at the first stage
From MaRDI portal
Publication:336642
DOI10.1016/j.cor.2013.05.020zbMath1348.90332OpenAlexW2049561666MaRDI QIDQ336642
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2013.05.020
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (4)
Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage ⋮ Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines ⋮ On the two-stage hybrid flow shop with dedicated machines ⋮ A two-stage flow shop scheduling problem with transportation considerations
Cites Work
- Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
- Branch and bound algorithm for the flow shop with multiple processors
- The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine
- Minimizing makespan in hybrid flowshops
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Two-stage flowshop scheduling with a common second-stage machine
- The hybrid flow shop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
- A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM
- The Complexity of Flowshop and Jobshop Scheduling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: A two-stage hybrid flow shop with dedicated machines at the first stage