Scheduling arc maintenance jobs in a network to maximize total flow over time

From MaRDI portal
Revision as of 03:33, 30 January 2024 by Import240129110155 (talk | contribs) (Created automatically from import240129110155)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:406493

DOI10.1016/J.DAM.2012.05.027zbMath1297.90031DBLPjournals/dam/BolandKWZ14OpenAlexW2052429767WikidataQ57955352 ScholiaQ57955352MaRDI QIDQ406493

Hamish Waterer, Thomas Kalinowski, Natashia Boland, Lanbo Zheng

Publication date: 8 September 2014

Published in: Discrete Applied Mathematics (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.dam.2012.05.027




Related Items (7)


Uses Software



Cites Work




This page was built for publication: Scheduling arc maintenance jobs in a network to maximize total flow over time