An inventory model for product life cycle with maturity stage and defective items
From MaRDI portal
Publication:505115
DOI10.1007/s12597-012-0075-4zbMath1353.90010OpenAlexW2069700156MaRDI QIDQ505115
Publication date: 19 January 2017
Published in: Opsearch (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s12597-012-0075-4
Related Items
Integrated procurement-production inventory model for defective items with variable setup and ordering cost ⋮ Inventory model for convertible item with deterioration
Uses Software
Cites Work
- On optimal batch sizing in a multi-stage production system with rework consideration
- EBQ for a multistage production system considering rework
- Production planning and inventory control with remanufacturing and disposal
- An optimal production run time with imperfect production processes and allowable shortages
- Optimal batch sizing in a multi-stage production system with rework consideration
- Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages