On optimal batch sizing in a multi-stage production system with rework consideration

From MaRDI portal
Publication:1041995

DOI10.1016/j.ejor.2008.04.015zbMath1176.90154OpenAlexW2025693970MaRDI QIDQ1041995

Leopoldo Eduardo Cárdenas-Barrón

Publication date: 7 December 2009

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2008.04.015




Related Items (15)



Cites Work


This page was built for publication: On optimal batch sizing in a multi-stage production system with rework consideration