Level scheduling under limited resequencing flexibility
From MaRDI portal
Publication:539476
DOI10.1007/s10696-010-9065-0zbMath1213.90116OpenAlexW1965913855MaRDI QIDQ539476
Armin Scholl, Malte Fliedner, Nils Boysen
Publication date: 30 May 2011
Published in: Flexible Services and Manufacturing Journal (Search for Journal in Brave)
Full work available at URL: https://www.db-thueringen.de/servlets/MCRFileNodeServlet/dbt_derivate_00021006/2010-6.pdf
Cites Work
- Unnamed Item
- Solving symmetric mixed-model multi-level just-in-time scheduling problems
- Sequencing mixed-model assembly lines: survey, classification and model critique
- The product rate variation problem and its relevance in real world mixed-model assembly lines
- Heuristics and exact algorithms for solving the Monden problem
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
- Cyclic just-in-time sequences are optimal
- The maximum deviation just-in-time scheduling problem.
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Minimizing variation of production rates in just-in-time systems: A survey
- Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling
- A sequential ordering problem in automotive paint shops
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Searching optimal resequencing and feature assignment on an automated assembly line
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Level Schedules for Mixed-Model, Just-in-Time Processes
- Least in-sequence probability heuristic for mixed-volume production lines
- An $n^{5/2} $ Algorithm for Maximum Matchings in Bipartite Graphs
This page was built for publication: Level scheduling under limited resequencing flexibility