Solving symmetric mixed-model multi-level just-in-time scheduling problems
From MaRDI portal
(Redirected from Publication:968134)
Recommendations
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
- Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Level scheduling for batched JIT supply
Cites work
- Heuristics and exact algorithms for solving the Monden problem
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally
- Level scheduling of mixed-model assembly lines under storage constraints
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
- Response time variability
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Simultaneous optimization of classical objectives in JIT scheduling
- The product rate variation problem and its relevance in real world mixed-model assembly lines
Cited in
(6)- Exact and meta-heuristic approaches for the production leveling problem
- Advanced constraint propagation for the combined car sequencing and level scheduling problem
- Scheduling just-in-time part supply for mixed-model assembly lines
- Level scheduling for batched JIT supply
- Output rate variation problem: some heuristic paradigms and dynamic programming
- Level scheduling under limited resequencing flexibility
This page was built for publication: Solving symmetric mixed-model multi-level just-in-time scheduling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q968134)