The product rate variation problem and its relevance in real world mixed-model assembly lines
From MaRDI portal
Publication:1015006
DOI10.1016/j.ejor.2008.06.038zbMath1159.90359OpenAlexW1964554277MaRDI QIDQ1015006
Malte Fliedner, Armin Scholl, Nils Boysen
Publication date: 30 April 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://www.db-thueringen.de/servlets/MCRFileNodeServlet/dbt_derivate_00020956/2007-11.pdf
Related Items (8)
Exact and meta-heuristic approaches for the production leveling problem ⋮ Integer programming models versus advanced planning business software for a multi-level mixed-model assembly line problem ⋮ Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line ⋮ Level scheduling under limited resequencing flexibility ⋮ Solving symmetric mixed-model multi-level just-in-time scheduling problems ⋮ Level scheduling for batched JIT supply ⋮ Advanced constraint propagation for the combined car sequencing and level scheduling problem ⋮ Multi-objective optimal scheduling of reconfigurable assembly line for cloud manufacturing
Cites Work
- Unnamed Item
- Unnamed Item
- Simultaneous optimization of classical objectives in JIT scheduling
- Response time variability
- Sequencing mixed-model assembly lines to minimize part inventory cost
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Heuristics and exact algorithms for solving the Monden problem
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
- A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines
- Supply chain planning in the German automotive industry
- Minimizing variation of production rates in just-in-time systems: A survey
- On the high multiplicity traveling salesman problem
- A methodology for modeling inter-company supply chains and for evaluating a method of integrated product and process documentation
- Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication
- Level Schedules for Mixed-Model, Just-in-Time Processes
- Sequencing mixed-model assembly lines to level parts usage and minimize line length
- Designing a mixed-model, open-station assembly line using mixed-integer programming
- Mixed-Model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage
This page was built for publication: The product rate variation problem and its relevance in real world mixed-model assembly lines