Scheduling of flexible flow lines in an automobile assembly plant
From MaRDI portal
Publication:1278630
DOI10.1016/S0377-2217(96)00203-2zbMath0930.90016OpenAlexW2163648708MaRDI QIDQ1278630
Publication date: 22 February 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00203-2
Related Items (10)
Scheduling flexible flow lines with sequence-dependent setup times ⋮ Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times ⋮ A taxonomy of flexible flow line scheduling procedures ⋮ Control methods for dynamic time-based manufacturing under customized product lead times ⋮ Cyclic scheduling in robotic flowshops with bounded work-in-process levels ⋮ A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria ⋮ The hybrid flow shop scheduling problem ⋮ Minimizing makespan in two-stage hybrid cross docking scheduling problem ⋮ A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines ⋮ Capacity-constrained production scheduling of multiple vehicle programs in an automotive pilot plant
Cites Work
This page was built for publication: Scheduling of flexible flow lines in an automobile assembly plant