Capacity-constrained production scheduling of multiple vehicle programs in an automotive pilot plant
From MaRDI portal
Publication:3439877
DOI10.1080/00207540500521212zbMath1122.90345MaRDI QIDQ3439877
Publication date: 18 May 2007
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540500521212
Related Items
Cites Work
- Scheduling of flexible flow lines in an automobile assembly plant
- Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups
- Capacity-constrained scheduling for a logic IC final test facility
- Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
- Scheduling in the dynamic job shop under auxiliary resource constraints: A simulation study
- Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors — a case study
- Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility