Control methods for dynamic time-based manufacturing under customized product lead times
From MaRDI portal
Publication:439459
DOI10.1016/j.ejor.2011.10.014zbMath1244.90087OpenAlexW1972900968MaRDI QIDQ439459
Publication date: 16 August 2012
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2011.10.014
distributed controldynamic schedulinghybrid flow shopcustomer order flexibilitytime-based manufacturing
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Case-oriented studies in operations research (90B90)
Related Items (2)
Modeling the dynamics of a multi-product manufacturing system: a real case application ⋮ Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
Cites Work
- Scheduling of flexible flow lines in an automobile assembly plant
- Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop.
- Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
- Heuristics for hybrid flow shops with controllable processing times and assignable due dates
- A review of exact solution methods for the non-preemptive multiprocessor flowshop problem
- Scheduling flexible flow lines with sequence-dependent setup times
- The hybrid flow shop scheduling problem
- A survey of scheduling problems with setup times or costs
- Flexible flow shop scheduling with uniform parallel machines
- Optimal Lead Time Policies
- Due date assignment using artificial neural networks under different shop floor control strategies
- Real-time due-date promising by build-to-order environments
- Multiple machine JIT scheduling: a tabu search approach
- Conceptual framework for lot-sizing and scheduling of flexible flow lines
This page was built for publication: Control methods for dynamic time-based manufacturing under customized product lead times