Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers

From MaRDI portal
Publication:1585811

DOI10.1016/S0895-7177(00)00110-2zbMath0969.90048OpenAlexW2013463306WikidataQ127018548 ScholiaQ127018548MaRDI QIDQ1585811

Tadeusz J. Sawik

Publication date: 14 November 2000

Published in: Mathematical and Computer Modelling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0895-7177(00)00110-2



Related Items

Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspectiveTwo metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon caseAn exact approach for batch scheduling in flexible flow lines with limited intermediate buffers.Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithmControl methods for dynamic time-based manufacturing under customized product lead timesAnt colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problemModeling realistic hybrid flexible flowshop scheduling problemsA memetic algorithm for the flexible flow line scheduling problem with processor blockingAn effective hybrid genetic algorithm for flow shop scheduling with limited buffersThe hybrid flow shop scheduling problemA multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturingOptimal scheduling for flexible job shop operationEVALUATING PERFORMANCE OF FLOW LINE SYSTEMS WITH BLOCKING UNDER FUZZY ENVIRONMENTSA fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approachA note of using effective immune based approach for the flow shop scheduling with buffersMonolithic vs. hierarchical balancing and scheduling of a flexible assembly line



Cites Work