Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
From MaRDI portal
Publication:1585811
DOI10.1016/S0895-7177(00)00110-2zbMath0969.90048OpenAlexW2013463306WikidataQ127018548 ScholiaQ127018548MaRDI QIDQ1585811
Publication date: 14 November 2000
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0895-7177(00)00110-2
Related Items
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective ⋮ Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case ⋮ An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers. ⋮ Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm ⋮ Control methods for dynamic time-based manufacturing under customized product lead times ⋮ Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem ⋮ Modeling realistic hybrid flexible flowshop scheduling problems ⋮ A memetic algorithm for the flexible flow line scheduling problem with processor blocking ⋮ An effective hybrid genetic algorithm for flow shop scheduling with limited buffers ⋮ The hybrid flow shop scheduling problem ⋮ A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing ⋮ Optimal scheduling for flexible job shop operation ⋮ EVALUATING PERFORMANCE OF FLOW LINE SYSTEMS WITH BLOCKING UNDER FUZZY ENVIRONMENTS ⋮ A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approach ⋮ A note of using effective immune based approach for the flow shop scheduling with buffers ⋮ Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
Cites Work
- Unnamed Item
- A mixed integer program for loading and scheduling multiple flexible manufacturing cells
- Simultaneous loading, routing, and assembly plan selection in a flexible assembly system
- Integer programming models for the design and balancing of flexible assembly systems
- Scheduling with Finite Capacity Output Buffers
- Scheduling with Finite Capacity Input Buffers
- Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
- Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
- Scheduling flexible flow lines with no in-process buffers
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process