Due date assignment using artificial neural networks under different shop floor control strategies
From MaRDI portal
Publication:3159654
DOI10.1080/00207540310001624375zbMath1094.90528OpenAlexW2002410899MaRDI QIDQ3159654
No author found.
Publication date: 16 February 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540310001624375
Applications of mathematical programming (90C90) Learning and adaptive systems in artificial intelligence (68T05) Production models (90B30)
Related Items (10)
Effective on-line algorithms for reliable due date quotation and large-scale scheduling ⋮ Online scheduling with immediate and reliable lead-time quotation ⋮ Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling ⋮ Control methods for dynamic time-based manufacturing under customized product lead times ⋮ Competitive analysis for make-to-order scheduling with reliable lead time quotation ⋮ Multi-agent-based workload control for make-to-order manufacturing ⋮ A fuzzy neural network for the flow time estimation in a semiconductor manufacturing factory ⋮ Dynamic job shop scheduling for missed due date performance ⋮ Development of a regression-based method with case-based tuning to solve the due date assignment problem ⋮ Using ensemble and metaheuristics learning principles with artificial neural networks to improve due date prediction performance
Cites Work
- Survey of scheduling research involving due date determination decisions
- A Simulation Study of Predictable Due-Dates
- Regression-based due date assignment rules for improved assembly shop performance
- The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
This page was built for publication: Due date assignment using artificial neural networks under different shop floor control strategies