The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
From MaRDI portal
Publication:4496986
Recommendations
- A Hybrid and Intelligent System for Predicting Lot Output Time in a Semiconductor Fabrication Factory
- Advances in Neural Networks – ISNN 2005
- Combining SOM and GA-CBR for Flow Time Prediction in Semiconductor Manufacturing Factory
- Modeling of throughput in production lines using response surface methodology and artificial neural networks
- Predicting glass furnace output using statistical and neural computing methods
Cited in
(10)- Using ensemble and metaheuristics learning principles with artificial neural networks to improve due date prediction performance
- scientific article; zbMATH DE number 5661217 (Why is no real title available?)
- Makespan estimation in batch process industries: A comparison between regression analysis and neural networks
- A GA-based NN approach for makespan estimation
- Modeling of throughput in production lines using response surface methodology and artificial neural networks
- A Hybrid and Intelligent System for Predicting Lot Output Time in a Semiconductor Fabrication Factory
- Combining SOM and GA-CBR for Flow Time Prediction in Semiconductor Manufacturing Factory
- Advances in Neural Networks – ISNN 2005
- Due date assignment using artificial neural networks under different shop floor control strategies
- Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories
This page was built for publication: The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4496986)