A Hybrid and Intelligent System for Predicting Lot Output Time in a Semiconductor Fabrication Factory
DOI10.1007/11908029_78zbMATH Open1162.68677OpenAlexW1583629825MaRDI QIDQ3535526FDOQ3535526
Authors: Toly Chen, Yucheng Lin
Publication date: 13 November 2008
Published in: Rough Sets and Current Trends in Computing (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/11908029_78
Recommendations
- Combining SOM and GA-CBR for Flow Time Prediction in Semiconductor Manufacturing Factory
- The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
- A fuzzy-neural knowledge-based system for job completion time prediction and internal due date assignment in a wafer fabrication plant
- Advances in Neural Networks – ISNN 2005
- Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility
Theory of languages and software systems (knowledge-based systems, expert systems, etc.) for artificial intelligence (68T35) Computing methodologies for information systems (hypertext navigation, interfaces, decision support, etc.) (68U35) Production models (90B30)
Cited In (6)
- A fuzzy neural network for the flow time estimation in a semiconductor manufacturing factory
- Data analytics and stochastic modelling in a semiconductor fab
- Combining SOM and GA-CBR for Flow Time Prediction in Semiconductor Manufacturing Factory
- Advances in Neural Networks – ISNN 2005
- Fuzzy technology in advanced manufacturing systems: A fuzzy-neural approach to job remaining cycle time estimation
- A fuzzy-neural knowledge-based system for job completion time prediction and internal due date assignment in a wafer fabrication plant
This page was built for publication: A Hybrid and Intelligent System for Predicting Lot Output Time in a Semiconductor Fabrication Factory
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3535526)