A Hybrid and Intelligent System for Predicting Lot Output Time in a Semiconductor Fabrication Factory
From MaRDI portal
Publication:3535526
Recommendations
- Combining SOM and GA-CBR for Flow Time Prediction in Semiconductor Manufacturing Factory
- The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
- A fuzzy-neural knowledge-based system for job completion time prediction and internal due date assignment in a wafer fabrication plant
- Advances in Neural Networks – ISNN 2005
- Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility
Cited in
(6)- Fuzzy technology in advanced manufacturing systems: A fuzzy-neural approach to job remaining cycle time estimation
- Combining SOM and GA-CBR for Flow Time Prediction in Semiconductor Manufacturing Factory
- A fuzzy-neural knowledge-based system for job completion time prediction and internal due date assignment in a wafer fabrication plant
- A fuzzy neural network for the flow time estimation in a semiconductor manufacturing factory
- Data analytics and stochastic modelling in a semiconductor fab
- Advances in Neural Networks – ISNN 2005
This page was built for publication: A Hybrid and Intelligent System for Predicting Lot Output Time in a Semiconductor Fabrication Factory
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3535526)