Heuristics for scheduling with inventory: Dynamic focus via constraint criticality
From MaRDI portal
Publication:1347601
DOI10.1002/JOS.91zbMath0995.90027OpenAlexW2073901754MaRDI QIDQ1347601
Publication date: 29 April 2002
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/jos.91
Search theory (90B40) Deterministic scheduling theory in operations research (90B35) Inventory, storage, reservoirs (90B05)
Related Items (4)
The project scheduling problem with production and consumption of resources: a list-scheduling based algorithm ⋮ Time-constrained project scheduling with adjacent resources ⋮ A cyclic approach to large-scale short-term planning in chemical batch production ⋮ Complexity of single machine scheduling subject to nonnegative inventory constraints
Cites Work
- Unnamed Item
- Unnamed Item
- The job shop scheduling problem: Conventional and new solution techniques
- The ODO project: Toward a unified basis for constraint-directed scheduling
- Adjustment of heads and tails for the job-shop problem
- Constraint-directed techniques for scheduling alternative activities
- Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristics
- Benchmarks for basic scheduling problems
This page was built for publication: Heuristics for scheduling with inventory: Dynamic focus via constraint criticality