A note on the SPT heuristic for solving scheduling problems with generalized due dates
From MaRDI portal
Publication:1433162
DOI10.1016/S0305-0548(03)00018-2zbMath1048.90107OpenAlexW1989949708MaRDI QIDQ1433162
Publication date: 15 June 2004
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0305-0548(03)00018-2
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
Related Items (16)
A single machine scheduling with generalized and periodic due dates to minimize total deviation ⋮ Branch-and-bound algorithm for total weighted tardiness minimization on parallel machines under release dates assumptions ⋮ A greedy heuristic for solving scheduling problems with bounded rejection cost ⋮ Single machine scheduling with rejection and generalized parameters ⋮ A note: minmax due-date assignment problem with lead-time cost ⋮ Just-In-Time Scheduling with Generalized Due Dates and Identical Due Date Intervals ⋮ Genetic programming-based hyper-heuristic approach for solving dynamic job shop scheduling problem with extended technical precedence constraints ⋮ Min–max version of single-machine scheduling with generalized due dates under scenario-based uncertainty ⋮ Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity ⋮ Order acceptance and scheduling with delivery under generalized parameters ⋮ Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem ⋮ A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints ⋮ Minimizing total late work on a single machine with generalized due-dates ⋮ Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty ⋮ Two-Machine Ordered Flow Shop Scheduling with Generalized Due Dates ⋮ Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates
This page was built for publication: A note on the SPT heuristic for solving scheduling problems with generalized due dates