On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown
From MaRDI portal
Publication:1630160
DOI10.1016/J.APM.2013.10.047zbMath1427.90129OpenAlexW2044196582MaRDI QIDQ1630160
Publication date: 7 December 2018
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2013.10.047
Related Items (2)
Modeling an inventory problem with random supply, inspection and machine breakdown ⋮ Heuristics for the economic production quantity problem under restrictions on production and maintenance time
Cites Work
- Unnamed Item
- A production-inventory model with probabilistic deterioration in two-echelon supply chain management
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
- Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework
- An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments
This page was built for publication: On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown