Resource-constrained flowshop scheduling with separate resource recycling operations
From MaRDI portal
Publication:1762095
DOI10.1016/j.cor.2010.07.015zbMath1251.90124OpenAlexW2098803166MaRDI QIDQ1762095
Bertrand M. T. Lin, Hsiao-Lan Huang, Cheng, T. C. Edwin
Publication date: 15 November 2012
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2010.07.015
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- On relocation problems with multiple identical working crews
- Minimizing the total weighted completion time in the relocation problem
- Johnson's rule, composite jobs and the relocation problem
- Scheduling subject to resource constraints: Classification and complexity
- A fast feasibility test for relocation problems
- Polynomial algorithms for single machine scheduling problems with financial constraints
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Optimal two- and three-stage production schedules with setup times included
- Relocation problems are hard
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- On the relocation problem with a second working crew for resource recycling
This page was built for publication: Resource-constrained flowshop scheduling with separate resource recycling operations