Dynamic scheduling problems in theory and practice2024-07-23Paper
Maximizing total early work in a distributed two‐machine flow‐shop2023-10-24Paper
Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work2022-12-23Paper
Two-machine flow shop scheduling with a common due date to maximize total early work2022-03-18Paper
Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs2020-03-06Paper
Minimizing machine assignment costs over \(\Delta\)-approximate solutions of the scheduling problem \(P||C_{\max}\)2019-10-07Paper
Server scheduling on parallel dedicated machines with fixed job sequences2019-08-12Paper
A note on network repair crew scheduling and routing for emergency relief distribution problem2019-07-25Paper
Preemptive parallel‐machine scheduling with a common server to minimize makespan2019-05-02Paper
Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines2018-07-12Paper
Single-machine scheduling with supporting tasks2018-05-24Paper
Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence2017-09-01Paper
Talent hold cost minimization in film production2017-06-15Paper
Acquisition planning and scheduling of computing resources2016-11-17Paper
Fast approximation algorithms for bi-criteria scheduling with machine assignment costs2016-06-23Paper
Relocation scheduling subject to fixed processing sequences2016-05-12Paper
Flow shop non-idle scheduling and resource-constrained scheduling2016-04-20Paper
Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence2015-01-22Paper
Total completion time minimization in a \(2\)-stage differentiation flowshop with fixed sequences per job type2013-04-04Paper
Resource-constrained flowshop scheduling with separate resource recycling operations2012-11-15Paper
Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence2012-07-12Paper
Tight complexity analysis of the relocation problem with arbitrary release dates2011-09-12Paper
Scheduling with centralized and decentralized batching policies in concurrent open shops2011-04-29Paper
Minimizing the total weighted completion time in the relocation problem2010-04-21Paper
Scheduling time-dependent jobs under mixed deterioration2010-04-14Paper
Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times2009-06-18Paper
Johnson's rule, composite jobs and the relocation problem2009-04-08Paper
A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations2008-12-04Paper
Complexity results for single-machine scheduling with positional learning effects2008-03-20Paper
A note on parallel-machine scheduling with deteriorating jobs2007-11-29Paper
On the relocation problem with a second working crew for resource recycling2007-11-13Paper
Customer order scheduling to minimize the number of late jobs2007-07-04Paper
On relocation problems with multiple identical working crews2007-02-20Paper
Two‐machine flowshop scheduling with conditional deteriorating second operations2006-09-14Paper
Ant colony optimization for the cell assignment problem in PCS networks2006-01-10Paper
Two-machine flowshop batching and scheduling2005-04-22Paper
Makespan minimization in single-machine scheduling with step-deterioration of processing times2005-04-04Paper
An ant colony optimization algorithm for the minimum weight vertex cover problem2005-01-17Paper
Minimizing the total completion time in single-machine scheduling with step-deteriorating jobs2004-11-19Paper
A concise survey of scheduling with time-dependent processing times2003-10-14Paper
Ant-Tree: an ant colony optimization approach to the generalized minimum spanning tree problem2003-08-25Paper
Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraints2002-08-18Paper
Fabrication scheduling on a single machine with due date constraints2002-01-01Paper
On the variable-depth-search heuristic for the linear-cost generalized assignment problem2001-10-16Paper
Batch scheduling in the no-wait two-machine flowshop to minimize the makespan2001-07-23Paper
An application of parallel virtual machine framework to film production problem2000-07-09Paper
The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine1999-09-22Paper
Scheduling to minimize the total compression and late costs1998-03-25Paper
Two-stage flowshop scheduling with a common second-stage machine1998-03-23Paper
Single Machine Scheduling to Minimize Batch Delivery and Job Earliness Penalties1997-06-12Paper
ON FINDING THE MOST VITAL JOB IN RELOCATION PROBLEM1995-05-23Paper
Optimal scheduling in film production to minimize talent hold cost1994-04-27Paper
Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem1994-01-02Paper
Generating the best \(K\) sequences in relocation problems1993-12-20Paper