Optimal production planning in pull flow lines with multiple products
From MaRDI portal
Publication:1809840
DOI10.1016/S0377-2217(98)00358-0zbMath0938.90024MaRDI QIDQ1809840
Jun Yang, Houmin Yan, Suresh P. Sethi
Publication date: 27 June 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Using stochastic optimization to determine threshold values for the control of unreliable manufacturing systems
- Optimal feedback controls in deterministic dynamic two-machine flowshops
- Optimal production planning in a multi-product stochastic manufacturing system with long-run average cost
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Dynamic Scheduling of a Multiclass Fluid Network
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
- Optimal control of pull manufacturing systems
This page was built for publication: Optimal production planning in pull flow lines with multiple products