Lead time considerations for the multi-level capacitated lot-sizing problem
From MaRDI portal
Publication:2629719
DOI10.1016/j.ejor.2014.09.030zbMath1339.90016MaRDI QIDQ2629719
Christian Almeder, Diego Klabjan, Bernardo Almada-Lobo, Renate Traxler
Publication date: 6 July 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://repositorio-aberto.up.pt/handle/10216/15850
Related Items
A sustainable inventory model to study the mixing and bottling plant of single item for cost minimization, Multi‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updating, A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem, Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demand, Classification and literature review of integrated lot-sizing and cutting stock problems, The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model, Distance and matching-induced search algorithm for the multi-level lot-sizing problem with substitutable bill of materials, Alternative mathematical models and solution approaches for lot-sizing and scheduling problems in the brewery industry: analyzing two different situations, A new heuristic and an exact approach for a production planning problem, Multi-echelon supply chains with lead times and uncertain demands. A lot-sizing formulation and solutions, Simultaneous lotsizing and scheduling problems: a classification and review of models, Integrated lot sizing and blending problems
Cites Work
- A hybrid multi-population genetic algorithm applied to solve the multi-level capacitated lot sizing problem with backlogging
- Multi-level single machine lot-sizing and scheduling with zero lead times
- On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- A note on ``the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures
- A hybrid optimization approach for multi-level capacitated lot-sizing problems
- Lot sizing and scheduling -- survey and extensions
- Heuristic genetic algorithms for general capacitated lot-sizing problems
- The application of valid inequalities to the multi-stage lot-sizing problem
- Capacitated lot-sizing with sequence dependent setup costs
- Multi-stage simultaneous lot-sizing and scheduling for flow line production
- An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
- Dynamic Version of the Economic Lot Size Model
- Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs
- Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation
- Combining population-based and exact methods for multi-level capacitated lot-sizing problems
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Computational Complexity of the Capacitated Lot Size Problem
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES
- Single machine multi-product capacitated lot sizing with sequence-dependent setups
- Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective