Controllable production rates in a family production context
From MaRDI portal
Publication:3354855
DOI10.1080/00207549108948096zbMath0729.90822OpenAlexW2017664182MaRDI QIDQ3354855
Guillermo Gallego, David Simchi-Levi, Il-Kyeong Moon
Publication date: 1991
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549108948096
Related Items (15)
Batch sizing with controllable production rates ⋮ Accounting for idle capacity cost in the scheduling of economic lot sizes ⋮ A hybrid manufacturing system with demand for intermediate goods and controllable make-to-stock production rate ⋮ Simultaneous determination of the cutting speed and lot size values in machining systems ⋮ Optimal production stopping time for perishable products with ramp-type quadratic demand dependent production and setup cost ⋮ A volume flexible economic production lot-sizing problem with imperfect quality and random machine failure in fuzzy-stochastic environment ⋮ A NOTE ON EPQ MODEL FOR SEASONAL PERISHABLE PRODUCTS WITH STOCK DEPENDENT DEMAND ⋮ Single item lot-sizing problem for a warm/cold process with immediate lost sales ⋮ Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions ⋮ The impact of controllable production rates on the performance of inventory systems: a systematic review of the literature ⋮ Reduced production rates in the economic lot scheduling problem ⋮ Information technology investments and volume-flexibility in production systems ⋮ Hybrid genetic algorithm for the economic lot-scheduling problem ⋮ Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times ⋮ The use of genetic algorithms to solve the economic lot size scheduling problem
Cites Work
- Unnamed Item
- Queueing-location problems on the plane
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- The Effect of Externalizing Setups in the Economic Lot Scheduling Problem
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Reduced production rates in the economic lot scheduling problem
- Strategic investment to reduce setup times in the economic lot scheduling problem
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- Scheduling the Production of Several Items with Random Demands in a Single Facility
This page was built for publication: Controllable production rates in a family production context