Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup
From MaRDI portal
Publication:3621499
DOI10.1590/S0101-74382007000300005zbMath1176.90233MaRDI QIDQ3621499
João Vitor Moccellin, Marcelo Seido Nagano
Publication date: 21 April 2009
Published in: Pesquisa Operacional (Search for Journal in Brave)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times
- The two-machine sequence dependent flowshop scheduling problem
- A new heuristic method for the flow shop sequencing problem
- Heuristics for the flow line problem with setup costs
- Two-stage no-wait scheduling models with setup and removal times separated
- An enhanced TSP-based heuristic for makespan minimization in a flow shop with setup times
- Flowshop scheduling research after five decades
- A review of TSP based approaches for flowshop scheduling
- Optimal two- and three-stage production schedules with setup times included
- Job lateness in flowshops with setup and removal times separated
- A MILP model for then-job,M-stage flowshop with sequence dependent set-up times
- Two machine flow shop scheduling problems with sequence dependent setup times: A dynamic programming approach
- The Complexity of Flowshop and Jobshop Scheduling
- A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
- A New Heuristic Method for the Permutation Flow Shop Scheduling Problem
- A Savings Index Heuristic Algorithm for Flowshop Scheduling with Sequence Dependent Set-up Times
- Flowshop-scheduling problems with makespan criterion: a review
This page was built for publication: Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup