Marcelo Seido Nagano

From MaRDI portal
(Redirected from Person:319422)



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
An ALNS to optimize makespan subject to total completion time for no-wait flow shops with sequence-dependent setup times
Top
2024-08-26Paper
A reactive iterated greedy algorithm for the no-wait flowshop to minimize total tardiness
Journal of Industrial and Management Optimization
2024-07-18Paper
An efficient iterated greedy algorithm for a multi-objective no-wait flow shop problem with sequence dependent setup times
4OR
2024-04-21Paper
The seeds of the NEH algorithm: an overview using bibliometric analysis
SN Operations Research Forum
2024-02-20Paper
A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness
Engineering Optimization
2024-02-14Paper
scientific article; zbMATH DE number 7777279 (Why is no real title available?)2023-12-13Paper
A constraint programming-based iterated greedy algorithm for the open shop with sequence-dependent processing times and makespan minimization
Computers & Operations Research
2023-11-13Paper
An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
Engineering Optimization
2023-10-10Paper
A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions
Engineering Optimization
2023-10-10Paper
Formulations and an adaptive large neighborhood search for just-in-time scheduling of unrelated parallel machines with a common due window
Computers & Operations Research
2023-07-04Paper
Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
Engineering Optimization
2022-12-23Paper
High-performing heuristics to minimize flowtime in no-idle permutation flowshop
Engineering Optimization
2022-12-23Paper
Beam search-based heuristics for the mixed no-idle flowshop with total flowtime criterion
OR Spectrum
2022-11-23Paper
New efficient heuristics for scheduling open shops with makespan minimization
Computers & Operations Research
2022-06-22Paper
A closed-loop model of a multi-station and multi-product manufacturing system using bond graphs and hybrid controllers
European Journal of Operational Research
2018-05-25Paper
Modeling the dynamics of a multi-product manufacturing system: a real case application
European Journal of Operational Research
2016-10-06Paper
Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup
Pesquisa Operacional
2009-04-21Paper
Reducing mean flow time in permutation flow shop
The Journal of the Operational Research Society
2008-08-14Paper
A high quality solution constructive heuristic for flow shop sequencing
The Journal of the Operational Research Society
2005-03-14Paper
Evaluating the performance of tabu search procedures for flow shop sequencing
The Journal of the Operational Research Society
2005-01-19Paper


Research outcomes over time


This page was built for person: Marcelo Seido Nagano