Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot
From MaRDI portal
Publication:3637411
DOI10.1287/opre.1030.0073zbMath1165.90443OpenAlexW3124318612MaRDI QIDQ3637411
R. Chandrasekaran, Inna G. Drobouchevitch, Chelliah Skriskandarajah, Suresh P. Sethi
Publication date: 10 July 2009
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.1030.0073
Related Items (12)
Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times ⋮ A note on productivity gains in flexible robotic cells ⋮ Cyclic scheduling of parts and robot moves in \(m\)-machine robotic cells ⋮ Sequencing and scheduling in robotic cells: recent developments ⋮ SOME UNDERLYING MATHEMATICAL DEFINITIONS AND PRINCIPLES FOR CELLULAR MANUFACTURING ⋮ MIP models and hybrid algorithm for minimizing the makespan of parallel machines scheduling problem with a single server ⋮ Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells ⋮ Throughput optimization in robotic cells with input and output machine buffers: a comparative study of two key models ⋮ Parallel machine scheduling with multiple unloading servers ⋮ Transporting jobs through a two‐machine open shop ⋮ A review of TSP based approaches for flowshop scheduling ⋮ Scheduling dual gripper robotic cell: one-unit cycles
This page was built for publication: Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot