Optimum Replacement of a System Subject to Shocks
From MaRDI portal
Publication:3670901
DOI10.1287/opre.31.4.697zbMath0521.90053OpenAlexW2100368497MaRDI QIDQ3670901
Philip J. Boland, Frank Proschan
Publication date: 1983
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.31.4.697
replacement policyperiodic replacementfinite and infinite time horizonsexistence of an optimal finite periodPoisson process of shocks
Related Items
A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times, Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy, On some properties of distributions possessing a bathtub-shaped failure rate average, Optimum replacement policies for systems subject to shocks, A note on replacement policy for a system subject to non-homogeneous pure birth shocks, Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy, An extended optimal replacement model of systems subject to shocks, Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks, A general ordering policy with number-dependent minimal repair and random lead time, Number-dependent replacement model with random lead-time for systems under maintenance continuously, Optimal replacement in a discrete time shock model., Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time, Age replacement policy for a two-unit system subject to non-homogeneous pure birth shocks, A generalized age and block replacement of a system subject to shocks, Extended block replacement policy with shock models and used items