Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy
From MaRDI portal
Publication:345793
DOI10.1016/J.APM.2012.02.031zbMATH Open1349.90245OpenAlexW2044422786MaRDI QIDQ345793FDOQ345793
Yen-Luan Chen, Chin-Chih Chang, Shey-Huei Sheu
Publication date: 2 December 2016
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2012.02.031
Recommendations
- A bivariate optimal replacement policy for a system with age-dependent minimal repair and cumulative repair-cost limit
- Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy
- A periodical replacement model based on cumulative repair-cost limit
- Optimal age-replacement model with minimal repair based on a cumulative damage limit policy
- Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Optimal Number of Minimal Repairs before Replacement
- Age-dependent minimal repair
- Extended optimal replacement model with random minimal repair costs
- Analysis of a system with minimal repair and its application to replacement policy
- Replacement policies for a cumulative damage model with minimal repair at failure
- Periodic Replacement with Increasing Minimal Repair Costs at Failure
- Failure distributions of shock models
- The Age Replacement Problem with Minimal Repair and Random Repair Costs
- GENERALIZED MODELS FOR DETERMINING OPTIMAL NUMBER OF MINIMAL REPAIRS BEFORE REPLACEMENT
- Title not available (Why is that?)
- Optimal number of minor failures before replacement
- A graphical method to repair-cost limit replacement policies with imperfect repair.
- A Modified Block Replacement with Two Variables
- A Combined Block and Repair Limit Replacement Policy
- Periodic replacement when minimal repair costs vary with time
- Optimal Number of Failures before Replacement Time
- Optimum Replacement of a System Subject to Shocks
- Age Replacement Policy With Age-Dependent Minimal Repair*
- Title not available (Why is that?)
- An imperfect maintenance model with block replacements
- Some replacement policies with minimal repairs and repair cost limit
- A Note on the Repair Limit Replacement Policy
- Optimal block replacement policies with multiple choice at failure
- An Age Replacement Policy with Minimal Repair Cost Limit
- The Optimum Repair Limit Replacement Policies
- Optimal number of minimal repairs before replacement of a system subject to shocks
- A modified block replacement policy with two variables and general random minimal repair cost
- Title not available (Why is that?)
- A Replacement Policy Based on Limits for the Repair Cost Rate
- A new graphical method to estimate the optimal repair-time limit with incomplete repair and discounting
Cited In (14)
- Age-replacement policy for items described by stochastic degradation with dependent increments
- Optimal Age Policy for a Used System with Imperfect Preventive Maintenance and Cumulative Damage Model
- Mathematical modeling and performance analysis of machine repairable system with hot spares
- Extended replacement policy for a system under shocks effect
- A periodical replacement model based on cumulative repair-cost limit
- Some replacement policies with minimal repairs and repair cost limit
- A new generalized burn-in procedure for items in stochastically evolving population
- A time-replacement policy for multistate systems with aging components under maintenance, from a component perspective
- Optimal preventive policies for imperfect maintenance models with replacement first and last
- Optimal age-replacement model with minimal repair based on a cumulative damage limit policy
- Maintenance scheduling under age replacement policy using proportional hazards model and TTT-plotting
- Catastrophe control of aphid populations model
- A bivariate optimal replacement policy with cumulative repair cost limit under cumulative damage model
- Age replacement policy for a two-unit system subject to non-homogeneous pure birth shocks
This page was built for publication: Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q345793)