Hierarchical Production Planning: A Two-Stage System

From MaRDI portal
Revision as of 22:40, 5 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:3939581

DOI10.1287/OPRE.30.2.232zbMath0481.90040OpenAlexW2055991336MaRDI QIDQ3939581

Elizabeth A. Haas, Gabriel R. Bitran, Arnoldo C. Hax

Publication date: 1982

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.30.2.232




Related Items (20)

A robust optimisation model for aggregate and detailed planning of a multi-site procurement-production-distribution systemLittle laws for utility processes and waiting times in queuesIntegrating deterioration and lifetime constraints in production and supply chain planning: a surveyCapacity analysis in repetitive assemble-to-order manufacturing systemsHierarchical production planning and scheduling with random demand and production failureA bi-objective aggregate production planning problem with learning effect and machine deterioration: modeling and solutionMulti-level production scheduling for a class of flexible machining and assembly systemsA survey on the continuous nonlinear resource allocation problemCapacitated lot-sizing and scheduling by Lagrangean relaxationA generalized Benders decomposition based algorithm for an inventory location problem with stochastic inventory capacity constraintsProduction planning with load dependent lead times: An update of researchAggregate order release planning for time-varying demandAn integrated aggregate and detailed planning in a multi-site production environment using linear programmingAggregate scheduling and network solving of multi-stage and multi-item manufacturing systemsMaterial allocation in MRP with tardiness penaltiesAggregate overhaul and supply chain planning for rotablesAn interactive decision framework for multiple objective production planningA review of \(L=\lambda W\) and extensionsRestrictive aggregation of items in multi-stage production systemsTool capacity planning in semiconductor manufacturing.







This page was built for publication: Hierarchical Production Planning: A Two-Stage System