Hierarchical Production Planning: A Two-Stage System
From MaRDI portal
Publication:3939581
DOI10.1287/OPRE.30.2.232zbMath0481.90040OpenAlexW2055991336MaRDI QIDQ3939581
Elizabeth A. Haas, Gabriel R. Bitran, Arnoldo C. Hax
Publication date: 1982
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.30.2.232
Related Items (20)
A robust optimisation model for aggregate and detailed planning of a multi-site procurement-production-distribution system ⋮ Little laws for utility processes and waiting times in queues ⋮ Integrating deterioration and lifetime constraints in production and supply chain planning: a survey ⋮ Capacity analysis in repetitive assemble-to-order manufacturing systems ⋮ Hierarchical production planning and scheduling with random demand and production failure ⋮ A bi-objective aggregate production planning problem with learning effect and machine deterioration: modeling and solution ⋮ Multi-level production scheduling for a class of flexible machining and assembly systems ⋮ A survey on the continuous nonlinear resource allocation problem ⋮ Capacitated lot-sizing and scheduling by Lagrangean relaxation ⋮ A generalized Benders decomposition based algorithm for an inventory location problem with stochastic inventory capacity constraints ⋮ Production planning with load dependent lead times: An update of research ⋮ Aggregate order release planning for time-varying demand ⋮ An integrated aggregate and detailed planning in a multi-site production environment using linear programming ⋮ Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems ⋮ Material allocation in MRP with tardiness penalties ⋮ Aggregate overhaul and supply chain planning for rotables ⋮ An interactive decision framework for multiple objective production planning ⋮ A review of \(L=\lambda W\) and extensions ⋮ Restrictive aggregation of items in multi-stage production systems ⋮ Tool capacity planning in semiconductor manufacturing.
This page was built for publication: Hierarchical Production Planning: A Two-Stage System