Capacity analysis in repetitive assemble-to-order manufacturing systems
From MaRDI portal
Publication:1342003
DOI10.1016/0377-2217(94)90383-2zbMATH Open0813.90052OpenAlexW2002824474MaRDI QIDQ1342003FDOQ1342003
Publication date: 11 January 1995
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90383-2
production planningproject managementcapacity analysisLagrangean relaxationhierarchical planningassemble-to-order capacity planningmake-to-stock planning
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Validation of subgradient optimization
- Lagrangean decomposition: A model yielding stronger lagrangean bounds
- Synchronized development of production, inventory, and distribution schedules
- Hierarchical Production Planning: A Two-Stage System
- On the choice of step size in subgradient optimization
- Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Hierarchical Production Planning: A Single Stage System
Cited In (6)
- Estimating the throughput of a cyclic assembly system
- A modified subgradient algorithm for Lagrangean relaxation
- Material requirement planning with fuzzy constraints and fuzzy coefficients
- Constrained multi-project planning problems: A Lagrangean decomposition approach
- MRP with flexible constraints: a fuzzy mathematical programming approach
- Capacity and material requirement planning modelling by comparing deterministic and fuzzy models
This page was built for publication: Capacity analysis in repetitive assemble-to-order manufacturing systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1342003)