Hierarchical Production Planning: A Two-Stage System
From MaRDI portal
Publication:3939581
DOI10.1287/opre.30.2.232zbMath0481.90040OpenAlexW2055991336MaRDI QIDQ3939581
Elizabeth A. Haas, Gabriel R. Bitran, Arnoldo C. Hax
Publication date: 1982
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.30.2.232
Related Items
A robust optimisation model for aggregate and detailed planning of a multi-site procurement-production-distribution system, Little laws for utility processes and waiting times in queues, Integrating deterioration and lifetime constraints in production and supply chain planning: a survey, Capacity analysis in repetitive assemble-to-order manufacturing systems, Hierarchical production planning and scheduling with random demand and production failure, A bi-objective aggregate production planning problem with learning effect and machine deterioration: modeling and solution, Multi-level production scheduling for a class of flexible machining and assembly systems, A survey on the continuous nonlinear resource allocation problem, Capacitated lot-sizing and scheduling by Lagrangean relaxation, A generalized Benders decomposition based algorithm for an inventory location problem with stochastic inventory capacity constraints, Production planning with load dependent lead times: An update of research, Aggregate order release planning for time-varying demand, An integrated aggregate and detailed planning in a multi-site production environment using linear programming, Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems, Material allocation in MRP with tardiness penalties, Aggregate overhaul and supply chain planning for rotables, An interactive decision framework for multiple objective production planning, A review of \(L=\lambda W\) and extensions, Restrictive aggregation of items in multi-stage production systems, Tool capacity planning in semiconductor manufacturing.