Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
From MaRDI portal
Publication:4015265
DOI10.1287/mnsc.38.9.1314zbMath0758.90040OpenAlexW2134755504MaRDI QIDQ4015265
Publication date: 12 January 1993
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.38.9.1314
Related Items (18)
A rework-based dispatching algorithm for module process in TFT-LCD manufacture ⋮ The economic production lot size model under volume flexibility ⋮ Optimizing a production system with rework and equal sized batch shipments ⋮ Optimal batch sizing in a multi-stage production system with rework consideration ⋮ On the probability distribution of total quality under sublot inspection and process restoration ⋮ The value of observing the condition of a deteriorating machine ⋮ Quality defaults and work-in-process inventory ⋮ The effect of testing errors on a repetitive testing process ⋮ The effect of testing equipment shift on optimal decisions in a repetitive testing process ⋮ A two-phase ant colony algorithm for multi-echelon defective supply chain network design ⋮ Integrated on-line and off-line quality control for products with destructive testing ⋮ Economic lot scheduling with uncontrolled co-production ⋮ An optimal batch size for an imperfect production system with quality assurance and rework ⋮ Production lot sizing with quality screening and rework ⋮ Determining the optimal probing lot size for the wafer probe operation in semiconductor manufacturing ⋮ Composing batches with yield uncertainty ⋮ Optimal production run length for products sold with warranty ⋮ ECONOMIC PRODUCTION LOT SIZING MODEL WITH STOCHASTIC DEMAND
This page was built for publication: Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework