Setting Planned Leadtimes in Capacity Requirements Planning
From MaRDI portal
Publication:4273244
DOI10.1057/jors.1993.139zbMath0781.90055OpenAlexW2000929684MaRDI QIDQ4273244
Hitoshi Tsubone, Haruki Matsuura
Publication date: 2 January 1994
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1993.139
material requirements planningLagrange's method of indeterminate coefficientsperiodic loading systemplanned leadtime
Related Items (3)
Setting optimal planned leadtimes in configure-to-order assembly systems ⋮ Capacity planning with congestion effects ⋮ Setting planned lead times for multi-operation jobs
This page was built for publication: Setting Planned Leadtimes in Capacity Requirements Planning