Scheduling in Robotic Cells: Classification, Two and Three Machine Cells

From MaRDI portal
Revision as of 23:38, 6 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:4367235

DOI10.1287/OPRE.45.3.421zbMath0891.90080OpenAlexW2114316204MaRDI QIDQ4367235

Nicholas G. Hall, Hichem Kamoun, Chelliah Skriskandarajah

Publication date: 25 November 1997

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.45.3.421




Related Items (32)

Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing timesBicriteria robotic cell schedulingA note on productivity gains in flexible robotic cellsCyclic scheduling of parts and robot moves in \(m\)-machine robotic cellsA branch and bound algorithm for the cyclic job-shop problem with transportationHybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentranceScheduling in a three-machine robotic flexible manufacturing cellOn a scheduling problem in a robotized analytical systemScheduling in reentrant robotic cells: algorithms and complexitySequencing and scheduling in robotic cells: recent developmentsScheduling with multiple serversSchedule-allocate and robust sequencing in three-machine robotic cell under breakdownsScheduling in robotic cells: process flexibility and cell layoutExact methods for the robotic cell problemIdentical part production in cyclic robotic cells: Concepts, overview and open questionsPart sequencing in three-machine no-wait robotic cellsRobotic cell scheduling with operational flexibilityApproximation algorithms for \(k\)-unit cyclic solutions in robotic cellsThroughput optimization in robotic cells with input and output machine buffers: a comparative study of two key modelsMakespan minimization for flow-shop problems with transportation times and a single robotCyclic scheduling of a 2-machine robotic cell with tooling constraintsCombinatorial optimization models for production scheduling in automated manufacturing systemsParallel machine scheduling with a common serverScheduling no-wait robotic cells with two and three machinesCyclic scheduling in 3-machine robotic flow shopsAn optimization-based heuristic for the robotic cell problemScheduling in robotic cells: Complexity and steady state analysisA review of TSP based approaches for flowshop schedulingRobotic-cell scheduling: special polynomially solvable cases of the traveling salesman problem on permuted Monge matricesOn scheduling cycle shops: Classification, complexity and approximationCycles and permutations in robotic cellsScheduling dual gripper robotic cell: one-unit cycles







This page was built for publication: Scheduling in Robotic Cells: Classification, Two and Three Machine Cells