scientific article; zbMATH DE number 2146482

From MaRDI portal
Revision as of 16:54, 7 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:4658190

zbMath1058.90500MaRDI QIDQ4658190

Louis W. Miller, William L. Maxwell, Richard Conway

Publication date: 16 March 2005


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (only showing first 100 items - show all)

Batch-scheduling problems to minimize actual flow times of parts through the shop under JIT environmentIntegration of lotsizing and scheduling decisions in a job-shopNonclairvoyant schedulingIncorporating preference information into multi-objective schedulingThe stochastic single machine scheduling problem with earliness and tardiness costsAn efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removalA scheduling problem in a semi-open job shop -- the case of a cordset manufacturing companyEarliness-tardiness scheduling problems with a common delivery windowOne-machine generalized precedence constrained scheduling problemsEvolution based learning in a job shop scheduling environmentEffective job shop scheduling through active chain manipulationFlowshop scheduling with dominant machinesDynamic non-preemptive single machine schedulingHeuristic algorithms for the two-stage hybrid flowshop problemSingle facility scheduling with major and minor setupsA fast finite loading algorithm for job oriented schedulingOn the existence of schedules that are near-optimal for both makespan and total weighted completion timeThe complexity of scheduling job families about a common due dateThe scheduling problem where multiple machines compete for a common local bufferQueue structure control in a single-server system with variable service rateSemi-active, active, and non-delay schedules for the resource-constrained project scheduling problemMultiple and bicriteria scheduling: A literature surveySolving a bicriterion scheduling problemGeneralized pairwise interchanges and machine schedulingJob-shop scheduling: Computational study of local search and large-step optimization methodsCharacterizing the set of feasible sequences for n jobs to be carried out on a single machineIs a unit-job shop not easier than identical parallel machines?An efficient job scheduling algorithm for mixed turnaround and deadline applicationsAn adaptive branching rule for the permutation flow-shop problemSequencing with general precedence constraintsComplexity results for scheduling chains on a single machineSubtractive clustering based modeling of job sequencing with parametric searchIdentical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexityPolling systems with breakdowns and repairs.Delay performance in stochastic processing networks with priority service.Weak-order extensions of an order.Resource-constrained project scheduling: A survey of recent developments.RTSS: An interactive decision support system for solving real time scheduling problems considering customer and job priorities with schedule interruptions.Discrete extremal problemsOn reducing time spent in M/G/1 systemsHybrid algorithm for sequencing with bicriteriaScheduling of plant maintenance personnelAn algorithm for single machine sequencing with release dates to minimize total weighted completion timeSurrogate duality relaxation for job shop schedulingA multi-objective approach to resource allocation in single machine schedulingFlow time distributions in a \(K\) class \(M/G/1\) priority feedback queueOn the complexity of generalized due date scheduling problemsThe complexity of shop-scheduling problems with two or three jobsOptimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machineStability of an optimal scheduleJob lateness in a two-machine flowshop with setup times separatedOn optimal lateness and tardiness scheduling in real-time systemsAn efficient heuristic approach to the scheduling of jobs in a flowshopEfficient heuristics to minimize total flow time with release datesSome new efficient methods to solve the \(n/1/r_ i/\sum{}T_ i\) scheduling problemMulti-item batching heuristics for minimization of queueing delaysResource constrained project scheduling with multiple objectives: a decision support approachDesign of manufacturing systems using queueing modelsScheduling stochastic jobs with increasing hazard rate on identical parallel machinesCapacitated two-parallel machines scheduling to minimize sum of job completion timesOn batch scheduling of jobs with stochastic service times and cost structures on a single serverScheduling according to job priority with prevention of deadlock and permanent blockingOptimal scheduling of homogeneous job systemsMultiple feedback at a single-server stationScheduling with list processing and problem oriented data structures. An itinerant teacher exampleSome notes on the queueing analysis of the SCAN policy of the walking serverM/G/1 round robin disciplineA tool-change scheduling model for machining centresStar search -- a different showMinimization of resource consumption under a given deadline in the two- processor flow-shop scheduling problemThe two-machine total completion time flow shop problemSerial and parallel resource-constrained project scheduling methods revisited: Theory and computationA strategy for evolution of algorithms to increase the computational effectiveness of NP-hard scheduling problemsIntegration of operation routing and economic production quantity decisions in batch manufacturing systemsThe job shop scheduling problem: Conventional and new solution techniquesVariants of the two machine flow shop problem connected with factorization of matrix functionsSingle machine scheduling with batch deliveriesScheduling with batch setup times and earliness-tardiness penaltiesEvaluation of leading heuristics for the single machine tardiness problemA framework for decision support systems of scheduling problemsParallel machine scheduling with a common serverAn evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environmentThe complexity of multidimensional periodic schedulingScheduling parallel tasks with individual deadlinesMinimizing makespan subject to minimum total flow-time on identical parallel machinesClass dependent departure process from multiclass phase queues: Exact and approximate analysesTwo-machine shop scheduling with zero and unit processing timesLead time selection and the behaviour of work flow in job shopsExperimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problemLot streaming in open shopsDeterministic job-shop scheduling problems with capacity focusDue date assignment procedures with dynamically updated coefficients for multilevel assembly job shopsParallel machine scheduling to minimize costs for earliness and number of tardy jobsScheduling two jobs with fixed and nonfixed routesScheduling identical parallel machines to minimize total weighted completion timeMinimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop schedulingA greedy heuristic for the mean tardiness sequencing problemNonpreemptive flowshop scheduling with machine dominanceAnalytical loading models in flexible manufacturing systemsComparative performance analysis of priority rules in a constrained flow shop with multiple processors environment







This page was built for publication: