Controlled alternative activity networks for project management (Q1107431)
From MaRDI portal
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Controlled alternative activity networks for project management |
scientific article |
Statements
Controlled alternative activity networks for project management (English)
0 references
1988
0 references
This paper presents a branching network to control a project with two different types of alternative events. The first one reflects stochastic (uncontrolled) branching of the development of a project. The alternative event of the second type is of a deterministic nature, i.e., the project's decision-maker chooses the outcome direction. Such a network contains alternative nodes with different logical operations at the input and output and includes both connective and diverging paths. The problem of controlling a project is, in essence, the choosing of an optimal outcome direction at every `decision-making' node which is reached in the course of the project's realization. This is carried out by a permanent reduction of the initial network and by applying a special algorithm described here, based on lexicographical scanning. A numerical example is given and application areas are presented.
0 references
controlled alternative activity networks
0 references
project management
0 references
outcome graph
0 references
joint variant
0 references
admissible plan
0 references
lexicographical order
0 references
branching network
0 references
two different types of alternative events
0 references
lexicographical scanning
0 references