The following pages link to Jürgen Zimmermann (Q207570):
Displaying 46 items.
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars (Q322689) (← links)
- The total adjustment cost problem: applications, models, and solution algorithms (Q398909) (← links)
- Dismantling of nuclear power plants at optimal NPV (Q646667) (← links)
- (Q954929) (redirect page) (← links)
- Scheduling tests in automotive R\&D projects (Q954930) (← links)
- Heuristic procedures for parallel-machine scheduling problems with stochastic precedence constraints (Q1273122) (← links)
- A steepest ascent approach to maximizing the net present value of projects (Q1396984) (← links)
- Order-based neighborhoods for project scheduling with nonregular objective functions. (Q1399577) (← links)
- Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints. (Q1412119) (← links)
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (Q1590046) (← links)
- Minimizing average project team size given multi-skilled workers with heterogeneous skill levels (Q1651635) (← links)
- Staff and machine shift scheduling in a German potash mine (Q1702661) (← links)
- Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages (Q1730713) (← links)
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems (Q1754108) (← links)
- Resource levelling for projects with schedule-dependent time windows (Q1806946) (← links)
- Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications (Q1854657) (← links)
- Mixed-integer linear programming for resource leveling problems (Q1926816) (← links)
- Time complexity of single- and identical parallel-machine scheduling with GERT network precedence constraints (Q1974581) (← links)
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers (Q2030539) (← links)
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q2152012) (← links)
- A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems (Q2178917) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines (Q2241902) (← links)
- A new mixed integer linear model for a rich vehicle routing problem with docking constraints (Q2430607) (← links)
- Exact methods for the resource levelling problem (Q2434257) (← links)
- Many-to-many location-routing with inter-hub transport and multi-commodity pickup-and-delivery (Q2514738) (← links)
- (Q2712374) (← links)
- (Q2744163) (← links)
- A heuristic approach to project staffing (Q2883648) (← links)
- (Q3416596) (← links)
- (Q3426442) (← links)
- (Q3518847) (← links)
- (Q4251544) (← links)
- (Q4437036) (← links)
- A bidirectional heuristic for maximizing the net present value of large-scale projects subject to limited resources (Q4456063) (← links)
- Two-Stage Heuristic Approach for Solving the Long-Term Unit Commitment Problem with Hydro-Thermal Coordination (Q4596261) (← links)
- (Q4667090) (← links)
- MILP-Formulations for the Total Adjustment Cost Problem (Q5171822) (← links)
- On a multi-project staffing problem with heterogeneously skilled workers (Q5176354) (← links)
- A Sampling Procedure for Real-Life Rich Vehicle Routing Problems (Q5391806) (← links)
- Optimal Usage of Flexibility Instruments in Automotive Plants (Q5391840) (← links)
- Production Chain Planning in the Automotive Industry (Q5391993) (← links)
- A Branch-and-Cut Approach to the Vehicle Routing Problem with Simultaneous Delivery and Pick-up (Q5392051) (← links)
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions (Q5945489) (← links)
- A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q6102850) (← links)