Pages that link to "Item:Q3632904"
From MaRDI portal
The following pages link to Principles of Sequencing and Scheduling (Q3632904):
Displayed 48 items.
- Pooling heterogeneous products for manufacturing environments (Q295883) (← links)
- Setting optimal due dates in a basic safe-scheduling model (Q336772) (← links)
- Decomposition based hybrid VNS-TS algorithm for distributed parallel factories scheduling with virtual corporation (Q337206) (← links)
- Weighted tardiness for the single machine scheduling problem:an examination of precedence theorem productivity (Q339549) (← links)
- A single machine carryover sequence-dependent group scheduling in PCB manufacturing (Q339574) (← links)
- Scheduling network maintenance jobs with release dates and deadlines to maximize total flow over time: bounds and solution strategies (Q342075) (← links)
- Evaluation of mathematical models for flexible job-shop scheduling problems (Q350406) (← links)
- Dominance rules in combinatorial optimization problems (Q421551) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- Comments on ``A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times'' (Q638896) (← links)
- Three-machine flow shop scheduling with overlapping waiting time constraints (Q1628045) (← links)
- On the flexibility of a decision theory-based heuristic for single machine scheduling (Q1628046) (← links)
- Group-shop scheduling with sequence-dependent set-up and transportation times (Q1634110) (← links)
- Sum-of-processing-times-based two-agent single-machine scheduling with aging effects and tardiness (Q1666548) (← links)
- Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures (Q1688445) (← links)
- A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem (Q1736622) (← links)
- A single-machine, single-wafer-processing, multiple-lots-per-carrier scheduling problem to minimize the sum of lot completion times (Q1762129) (← links)
- Survey on fuzzy shop scheduling (Q1794871) (← links)
- An \(O(n^{2})\) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines (Q1926814) (← links)
- A polynomial-time scheduling approach to minimise idle energy consumption: an application to an industrial furnace (Q2027050) (← links)
- Stochastic single machine scheduling problem as a multi-stage dynamic random decision process (Q2051165) (← links)
- Proactive policies for the stochastic resource-constrained project scheduling problem (Q2275822) (← links)
- Heuristic for stochastic online flowshop problem with preemption penalties (Q2312307) (← links)
- Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines (Q2317137) (← links)
- Approximated timed reachability graphs for the robust control of discrete event systems (Q2330041) (← links)
- Near-optimal heuristics for just-in-time jobs maximization in flow shop scheduling (Q2331444) (← links)
- An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors -- a case study (Q2337384) (← links)
- Maintenance optimization with duration-dependent costs (Q2341276) (← links)
- Bi-objective single machine scheduling problem with stochastic processing times (Q2343079) (← links)
- Trading off due-date tightness and job tardiness in a basic scheduling model (Q2356123) (← links)
- Minimizing earliness and tardiness costs in stochastic scheduling (Q2356252) (← links)
- A comparative study on three graph-based constructive algorithms for multi-stage scheduling with blocking (Q2423281) (← links)
- Solving a stochastic single machine problem with initial idle time and quadratic objective (Q2655649) (← links)
- A Batch Scheduling Problem with Two Agents (Q2788524) (← links)
- One-Machine Sequencing to Minimize Total Tardiness: A Fourth Theorem for Emmons (Q2875603) (← links)
- PROJECT MANAGEMENT GAMES (Q3166237) (← links)
- Parallel Machine Scheduling Under Uncertainty: Models and Exact Algorithms (Q5060784) (← links)
- (Q5077832) (← links)
- Scheduling steel plates on a roller furnace (Q5176336) (← links)
- Proportionate flow shop: New complexity results and models with due date assignment (Q5249462) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- Shop scheduling in manufacturing environments: a review (Q6060656) (← links)
- Two-machine flow shop scheduling with convex resource consumption functions (Q6097489) (← links)
- Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks (Q6109311) (← links)
- A multi-objective approach for manufacturing systems with multiple production routes based on supervisory control theory and heuristic algorithms (Q6120385) (← links)
- A note on the shifting bottleneck procedure for job shop scheduling (Q6136083) (← links)
- An efficient implementation of a VNS heuristic for the weighted fair sequences problem (Q6146639) (← links)
- Significantly improved dominance relation for no-wait flowshop scheduling problems with uncertain setup times (Q6157771) (← links)