A two-machine preemptive openshop scheduling problem: An elementary proof of NP-completeness
From MaRDI portal
Recommendations
- Scheduling two-machine preemptive open shops to minimize total completion time
- On the complexity of preemptive openshop scheduling problems
- On the complexity of preemptive open-shop scheduling problems
- scientific article; zbMATH DE number 1279216
- A note on the proof of the complexity of the little-preemptive open-shop problem
- Non-preemptive two-machine open shop scheduling with non-availability constraints
- scientific article; zbMATH DE number 5260089
- scientific article; zbMATH DE number 930117
- Polynomial-time approximation schemes for two-machine open shop scheduling with nonavailability constraints
Cites work
Cited in
(9)- On the complexity of preemptive open-shop scheduling problems
- On the complexity of preemptive openshop scheduling problems
- Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity
- Scheduling two-machine preemptive open shops to minimize total completion time
- Minimizing Mean Flow Time in Two-Machine Open Shops and Flow Shops
- The NP-completeness of the \(n/m/parallel/C_{\max}\) preemptive due-date scheduling problem
- On the open-shop problem with preemption and minimizing the average completion time
- A note on the proof of the complexity of the little-preemptive open-shop problem
- On the complexity of constructing multiprocessor little-preemptive schedules
This page was built for publication: A two-machine preemptive openshop scheduling problem: An elementary proof of NP-completeness
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1280122)